---
title: "Estimates, item settings and meeting tags"
description: "Choose how your teams estimate work, when completed items leave lists and boards, and which tags meetings can get."
---

> Documentation Index
> Fetch the complete documentation index at: https://spool.team/llms.txt
> Use this file to discover all available pages before exploring further.

# Estimates, item settings and meeting tags

These workspace settings shape day-to-day work in every team: how items are sized, how long finished items stay in view, and how meetings are tagged.

## Estimates

The estimate scale decides what people pick in an item's estimate field. Every estimate is stored as a number, so sprint capacity and velocity add up whatever the labels are.

| Estimate type | How it works |
| --- | --- |
| **Points** | Relative effort from a fixed list, like 1, 2, 3, 5, 8. This is the default, with Fibonacci values. |
| **T-shirt sizes** | XS to XL. Each size counts as a number of points for capacity. |
| **Hours** | Any amount in steps of 0.25. |
| **No estimates** | Items have no estimate field. |

Epics are never estimated, whichever type you choose.

### Change the scale

1. Open **Workspace settings** and go to **Estimates**.
2. Under **Estimate type**, pick a type.
3. For Points or T-shirt sizes, edit the list under **Point values** or **Sizes**. Click **Use a preset** to start from Fibonacci (1, 2, 3, 5, 8, 13), Linear (1, 2, 3, 4, 5), Exponential (1, 2, 4, 8, 16) or T-shirt (XS, S, M, L, XL). Click **Add option** for more.
4. Click **Save changes**.

For T-shirt sizes, each option has a label (like "M") and the number of points it counts as. Each label and each value must be different. You can have up to 20 options, with values above 0 and up to 1000.

## Hide completed items

Finished work piles up. To keep lists and boards focused, Spool hides items in Done and Canceled after a while.

1. Open **Workspace settings** and go to **Items**.
2. Under **Hide completed items after**, choose 1 week, 2 weeks, 3 weeks, 1 month or **Never hide**. The default is 2 weeks.

The setting saves as soon as you pick. It applies to every team. Hidden items aren't gone: sprints, search and links still show them, and a list with hidden items shows how many at the bottom, with a **Show** button to bring them back.

## Meeting tags

Tags help you sort and find meetings. When Spool writes a meeting's summary, it picks tags from this list based on the title and what was said. Anyone can change the tags on a meeting afterwards.

New workspaces start with Standup, Planning, Design review, Client call, Retro, 1:1 and Interview.

1. Open **Workspace settings** and go to **Meeting tags**.
2. To add a tag, type a name in **Add a tag**, like "Demo". It gets the next tag shade automatically.
3. To rename a tag, click its name and edit it in place.
4. To change a tag's shade, click its dot and pick another.

To delete a tag, click its delete button and confirm. Meetings with that tag lose it, and Spool stops suggesting it. Tag names must be unique.

## Related

- [Statuses and work item types](https://spool.team/docs/workspace/statuses-and-work-item-types/)
- [Workspace settings](https://spool.team/docs/workspace/overview/)
- [Roles and permissions](https://spool.team/docs/workspace/roles-and-permissions/)

Source: https://spool.team/docs/workspace/estimates-and-item-settings/index.mdx
