# Run and complete a sprint

Once a sprint is planned, start it and use the **Current** tab to see how it's going each day. When the time is up, complete it, decide where unfinished work goes, and look back at the numbers on the **Past** tab.

## Start a sprint

On the **Planning** tab, open the **⋯** menu on a planned sprint and click **Start sprint**. If another sprint is already active, the option reads **Start in parallel**, and both sprints run side by side.

Everyone in the team gets a notification in their Inbox when a sprint starts.

## Follow the current sprint

The **Current** tab shows the active sprint. If several are running, switch between them at the top left.

The top bar shows:

- **The day of the sprint**, such as "Day 4 of 14", and its dates.
- **Days left**, or **Overdue by** a number of days once the end date has passed.
- **Points done** out of the total, and **items done** out of the total.
- **The burndown**: a small chart marked **On track** or **Behind**. Click it for the full chart with the points left.
- **Complete**, to finish the sprint.

Under it you'll see the sprint goal, a progress bar split by status, and the percentage of points done. Below that is a board of the sprint's items. It works like the project's Items page: switch to a list, group by status or epic, filter, and drag cards to change status.

## Read the burndown

The burndown compares the points still open each day with an ideal straight line from the sprint's total points down to zero on the last day. Points drop when an item moves to Done. Canceled items are left out of the totals.

The sprint is **Behind** when more points are left today than the ideal line expects. After the end date, any points left mean it's behind. Editing the sprint's dates moves the ideal line too.

## Complete a sprint

1. On the **Current** tab, click **Complete**.
2. Check the summary of items and points done.
3. If there are open items, choose where they go: the next planned sprint, or **Backlog**. The list shows exactly which items will move.
4. If you send them to the next sprint, leave **Start \[next sprint] now** ticked to start it straight away, or untick it to start it later.
5. Click **Complete sprint**.

Open items are anything not Done or Canceled. Done and Canceled items stay with the sprint they finished in. Once completed, the sprint's points and item counts are frozen, so later changes to its items don't rewrite history.

Everyone in the team is notified when a sprint is completed, with the points done and where open items went.

## Review past sprints

The **Past** tab shows:

- **Velocity**: the average points done over the last 3 completed sprints, with a chart of planned against done points for recent sprints.
- **Completed**: every finished sprint with its goal, dates, points done, items done and how many items moved on.

Velocity also appears on sprint cards and in the **New sprint** dialog, to help you set a realistic capacity.

## Sprint notifications

Sprint notifications go to every member of the sprint's team. They appear in the Inbox by default, and email is off. Each person can change this under **Sprints** in their notification settings. Opening one takes you to the project's Sprints page. Creating, editing and deleting sprints doesn't send notifications.

## Related

- [Plan a sprint](https://spool.team/docs/sprints/plan-a-sprint/)
- [Sprints overview](https://spool.team/docs/sprints/overview/)
- [Views and filters](https://spool.team/docs/work-items/views-and-filters/)

Source: https://spool.team/docs/sprints/run-and-complete/index.mdx